Construction schedule generator with Gantt and PDF Excel export

The construction schedule generator with Gantt helps organize tasks, dependencies and trades. Designed for homeowners and professionals, it provides a clear project view with PDF and Excel export.

Comprehensive Construction Schedule Generator

Create a professional schedule for your building works. Manage tasks, trades and dependencies, and track progress.

Project information

Prefill your schedule with a template

Add a task

Hold Ctrl to select several

Free Construction Schedule Generator

Create a professional schedule for your construction or renovation works for free. Manage tasks, trades and dependencies between stages, and track progress with an interactive Gantt view. PDF and Excel export included.

Why create a works schedule before starting?

A well-structured works schedule is essential for a successful construction or renovation project. First, it lets you see the logical sequence of tasks and avoid costly mistakes such as painting before the tiles are laid or installing windows before redoing the electrics. The schedule helps you coordinate the different trades efficiently so they don't get in each other's way or wait for one another, which wastes time and money. It greatly simplifies ordering materials, since you know exactly when to order what so that everything arrives at the right time. You can also agree dates with each tradesperson by giving them a precise start date several weeks in advance. The schedule also lets you anticipate and budget costs by spreading spending over the duration of the project rather than paying everything at once. Finally, it serves as a communication tool for everyone involved: your architect, project manager and tradespeople all have access to the same calendar to know who works when.

How do you organize the stages of works in the right order?

The order of works follows an unchanging logic from structural work to finishes, and from inside to outside for some stages. The first phase is always site preparation: putting up the site sign, installing protection, temporary water and electricity connections, and renting a skip if needed. Next comes the structural work: demolishing partitions to be removed, creating openings in load-bearing walls with steel beams, repairing the roof structure if needed, redoing the roof before winter and treating damp walls. The technical finishing phase follows with electrics (running conduits and fitting boxes), plumbing (drains and water supply), heating (fitting radiators and boiler), insulation (loft, then walls, then floors) and ventilation. Then comes partitioning and insulation, with plasterboard partitions and soundproofing. External joinery is fitted next (windows, front door, shutters). Finishes include plastering and skimming, painting ceilings then walls, laying floor coverings (tiles in wet rooms first, then parquet in the other rooms), installing the kitchen and bathroom, fitting interior doors and skirting boards, and finally the last touch-ups.

How long do the different stages of works take?

The duration of each stage varies considerably with the size of the site, the number of tradespeople involved and the complexity of the works. For the renovation of a 70-80 m² apartment, demolition and removal of rubble usually takes 2 to 3 days. Building new plasterboard partitions takes 3 to 5 days depending on the number of walls. Bringing the electrics fully up to standard, with a new consumer unit and cables, takes 5 to 7 days. Full plumbing (bathroom + kitchen) takes 4 to 6 days. Blown loft insulation is done in 1 day, but wall lining insulation takes 5 to 8 days. Plasterboarding all walls and ceilings takes 7 to 10 days depending on the area. Filling and skimming take 3 to 4 days including drying time. Painting everything (2 coats) takes 8 to 12 days depending on the surfaces. Tiling a 5 m² bathroom takes 2 to 3 days, grouting included. Installing a standard fitted kitchen takes 2 days. Laying 50 m² of floating floor takes 2 to 3 days. Interior doors are fitted at a rate of about 4 per day. Always allow a 20 to 30% margin on these durations for the unexpected and for idle time between trades.

How do you manage dependencies between tasks?

Dependencies between tasks are crucial for a consistent schedule. Some tasks can only start once others are finished; these are strict dependencies. For example, you cannot lay tiles before the levelling screed is finished, which must dry for 3 weeks. You cannot paint before the plasterboard has been fitted and skimmed. The electrician cannot run cables if the partitions are not up. The plumber must come before the tiler to install concealed drains. Other dependencies are more flexible, allowing tasks to partly overlap. The electrician and plumber can work at the same time if they are not in the same rooms. The painter can start in some rooms while the tiler finishes in others. Our schedule generator lets you define these dependencies: when you add a new task, you simply select the tasks that must be finished before it. The tool automatically calculates the earliest start date taking these constraints and each task's duration into account. If you change a task's duration, all dependent tasks are recalculated automatically to keep the schedule consistent.

Which trades are essential for a renovation?

The trades you need depend on the scale of your renovation project. For a light renovation (refresh, painting), you will mainly need a painter and possibly a drywaller to fill holes and cracks. For a medium renovation, plan for an electrician to bring the installation up to standard and add sockets, a plumber to redo the bathroom or kitchen, a tiler for the floors and walls of wet rooms, a painter for the finishes and possibly a joiner to replace doors. For a major renovation, the full team includes a mason for demolition and creating openings, a carpenter if the roof structure needs work, a roofer for the roof, an electrician for a complete new installation, a plumber for all plumbing and heating, a heating engineer for the boiler and radiators, a drywaller to build partitions, a tiler for all hard floors, a floor layer for wooden floors, a painter for walls and ceilings, a joiner for doors and cupboards and possibly a kitchen fitter. If the project is complex, hire a project manager or architect to coordinate all these trades and ensure the schedule is respected. Our tool lets you assign each task to a specific trade and see how many different tradespeople you need on site.